Skip to main content

New tunnel begins to take shape at Tamaqua project

  • Empty

    New tunnel arch in Tamaqua

Published July 02. 2018 09:05PM

 

A pre-cast concrete arch was positioned at the Tamaqua Wabash Bridge Project on Monday, one of two that arrived on a flatbed early in the day. The arch covers part of a concrete foundation poured last week and replaces the original 166-year-old stone arch at this section of the creek as it flows beneath the downtown. DONALD R. SERFASS/SPECIAL TO THE TIMES NEWS

 

Classified Ads

Event Calendar

<<

February 2025

>>
SunMonTueWedThuFriSat
      
 

Upcoming Events

Twitter Feed