Skip to main content

Road Work Feb. 3-7

Published February 02. 2020 07:26PM

 

The Pennsylvania Department of Transportation announces the following road work this week, weather permitting:

Carbon County

• Bowmanstown, Route 248 East inspection between Fireline Road and Route 895, 9 a.m. to noon on Thursday.

• Bowmanstown, Route 248 West inspection between Route 895 and Fireline Road, noon to 3 p.m. on Thursday.

• Franklin and Towamensing townships: Route 209 pothole patching between Route 443 and Monroe County line, 7 a.m. to 3 p.m. Monday through Friday.

• Kidder Township, Route 534 pothole patching between Route 903 and River Road, 7 a.m. to 3 p.m. Monday through Friday.

• Kidder Township, Interstate 80 East bridge repair between Exit 273 (Route 940/Route 437) and Exit 274 (Route 534), 7 a.m. to 3 p.m. Monday through Friday.

Lehigh County

• Bethlehem, Route 378 brush cutting between Route 22 and Hill-to-Hill Bridge, 7 a.m. to 3 p.m. Tuesday through Friday.

• Various townships: I-78 East highway beautification between Exit 49 (Route 100) and Northampton County line, 9 a.m. to 2 p.m. Monday through Friday.

• Various townships: I-78 West highway beautification between Northampton County line and Exit 49 (Route 100), 9 a.m. to 2 p.m. Monday through Friday.

• South Whitehall Township, Route 309 drilling and sampling between I-78 and Route 22, 9 p.m. to 5 a.m. Monday through Friday.

• South Whitehall and Upper Macungie Townships: Route 22 drilling and sampling between I-78 and 15th Street, 8 p.m. to 5 a.m. Monday through Friday.

• South Whitehall Township, Route 22 at Route 309 drilling and sampling between Route 22 and Route 309, 8 p.m. to 5 a.m. Monday through Friday.

• Washington Township, Game Preserve Road bridge repair between Buck Hill Circle and Kistler Road, 7 a.m. to 3 p.m. Monday and Tuesday.

• Whitehall Township, Route 145/MacArthur Road drainage between 2nd Street and Neffs Laurys Road, 7 a.m. to 3 p.m. on Friday.

• Bethlehem, Route 378 brush cutting between 8th Avenue and Route 22, 7 a.m. to 3 p.m. Monday through Friday.

• Salisbury Township, I-78 East litter removal between Exit 54 (Route 222) and Exit 55 (Route 29), 9 a.m. to 2 p.m. Monday through Thursday.

 

Northampton County

• Lower Saucon Township, Seidersville Road shoulder work/widening between Bingen Road and Route 378, 9 a.m. to 2 p.m. Monday and Tuesday.

• Bethlehem and Lower Saucon Township, Route 378/Wyandotte Street crack sealing between Delaware Avenue and Lehigh County Line, 9 a.m. to 2 p.m. Monday through Friday.

• Palmer Township, Route 22 East at Route 33 inspection from 9 a.m. to 2 p.m. Monday and Tuesday.

Hanover and Bethlehem Townships: Route 22 drilling and sampling between Route 512 and Route 33, 8 p.m. to 5 a.m. Monday through Friday.

• Palmer Township, Route 22 East inspection between Route 33 and South 25th Street, 9 a.m. to 3 p.m. on Monday.

• Palmer Township, Route 22 West inspection between South 25th Street and Route 33, 9 a.m. to 3 p.m. on Tuesday.

Monroe County

• Stroudsburg, I-80 surveying between Exit 306 (Dreher Avenue) and Exit 302 (Route 33 to Route 209), 8 p.m. to 6 a.m. Sunday through Friday.

• Stroud Township, I-80 pothole patching between Exit 304 (Route 209 to Route 33) and Exit 307 (Route 611 to Route 191), 9 a.m. to 3 p.m. Monday and Tuesday.

• Various townships: Route 33 South drainage between Saylorsburg and Route 512, 9 a.m. to 3 p.m. Wednesday and Thursday.

• Tunkhannock Township, I-80 East pothole patching between Exit 277 (Route 940 / TPK) and Exit 284 (Route 115), 9 a.m. to 3 p.m. Monday and Tuesday.

• Polk Township, Route 534 tree cutting/removal between US 209 and Carbon County, 9 a.m. to 3 p.m. Monday through Friday.

• Smithfield Township, US 209 lane restrictions between I-80 and Oak Grove Road, 9 a.m. to 3 p.m. Monday through Friday.

• Hamilton Township, Greenview Drive tree cutting/removal between US 209 and Hamilton East Road, 9 a.m. to 3 p.m. on Friday.

Schuylkill County

• West Penn Township, Route 309 drainage between Clamtown Road and East Penn Drive, 7 a.m. to 3 p.m. Monday through Friday.

• Ryan and Rush townships: Route 54 pothole patching between Morea Road and Tippets Road, 7 a.m. to 3 p.m. Monday through Friday.

• Ryan and Mahanoy townships: I-81 crack sealing between Exit 124 (Route 61) and Exit 131 (Route 54), 7 a.m. to 3 p.m. Monday through Thursday.

 

Comments
This is the website I read about Dr Iwisa and contacted him to help me get my ex boyfriend back to marry me during the month of febuary this year and I have come back here to post about him.Dr Iwisa will help you solve your problem no matter what you are going through. My name is Lisa from Canada. Posting about a spell caster is very strange to me because I never believed i will be able to say that I was helped by a spell caster in bringing my ex boyfriend back to me after 2 years of no contact. I read about Dr IWisa from other websites and contacted him to help me and in less than 24 hours my ex boyfriend called me and I was happy that he wants to get back to me. We met and he proposed to me,... It was the most beautiful ring. Please everyone out here, Contact Dr Iwisa to solve your problem for you and make you happy with your relationship that is hurting you. Love is the best feeling ever experienced. Email: superiorspellhome@gmail.com Call & Whatsapp +27730886631 https://superiorspellhome.webnode.com
How about you PENNDOT get out there and patch the big potholes on route 248. I guess you forget about carbon county and you lie to the people. That road is like a washboard thanks to your failing to take care of it. If I could sue you, I would.

Classified Ads

Event Calendar

<<

November 2024

>>
SunMonTueWedThuFriSat
     

Upcoming Events

Twitter Feed