Road Work Feb. 3-7
The Pennsylvania Department of Transportation announces the following road work this week, weather permitting:
Carbon County
• Bowmanstown, Route 248 East inspection between Fireline Road and Route 895, 9 a.m. to noon on Thursday.
• Bowmanstown, Route 248 West inspection between Route 895 and Fireline Road, noon to 3 p.m. on Thursday.
• Franklin and Towamensing townships: Route 209 pothole patching between Route 443 and Monroe County line, 7 a.m. to 3 p.m. Monday through Friday.
• Kidder Township, Route 534 pothole patching between Route 903 and River Road, 7 a.m. to 3 p.m. Monday through Friday.
• Kidder Township, Interstate 80 East bridge repair between Exit 273 (Route 940/Route 437) and Exit 274 (Route 534), 7 a.m. to 3 p.m. Monday through Friday.
Lehigh County
• Bethlehem, Route 378 brush cutting between Route 22 and Hill-to-Hill Bridge, 7 a.m. to 3 p.m. Tuesday through Friday.
• Various townships: I-78 East highway beautification between Exit 49 (Route 100) and Northampton County line, 9 a.m. to 2 p.m. Monday through Friday.
• Various townships: I-78 West highway beautification between Northampton County line and Exit 49 (Route 100), 9 a.m. to 2 p.m. Monday through Friday.
• South Whitehall Township, Route 309 drilling and sampling between I-78 and Route 22, 9 p.m. to 5 a.m. Monday through Friday.
• South Whitehall and Upper Macungie Townships: Route 22 drilling and sampling between I-78 and 15th Street, 8 p.m. to 5 a.m. Monday through Friday.
• South Whitehall Township, Route 22 at Route 309 drilling and sampling between Route 22 and Route 309, 8 p.m. to 5 a.m. Monday through Friday.
• Washington Township, Game Preserve Road bridge repair between Buck Hill Circle and Kistler Road, 7 a.m. to 3 p.m. Monday and Tuesday.
• Whitehall Township, Route 145/MacArthur Road drainage between 2nd Street and Neffs Laurys Road, 7 a.m. to 3 p.m. on Friday.
• Bethlehem, Route 378 brush cutting between 8th Avenue and Route 22, 7 a.m. to 3 p.m. Monday through Friday.
• Salisbury Township, I-78 East litter removal between Exit 54 (Route 222) and Exit 55 (Route 29), 9 a.m. to 2 p.m. Monday through Thursday.
Northampton County
• Lower Saucon Township, Seidersville Road shoulder work/widening between Bingen Road and Route 378, 9 a.m. to 2 p.m. Monday and Tuesday.
• Bethlehem and Lower Saucon Township, Route 378/Wyandotte Street crack sealing between Delaware Avenue and Lehigh County Line, 9 a.m. to 2 p.m. Monday through Friday.
• Palmer Township, Route 22 East at Route 33 inspection from 9 a.m. to 2 p.m. Monday and Tuesday.
Hanover and Bethlehem Townships: Route 22 drilling and sampling between Route 512 and Route 33, 8 p.m. to 5 a.m. Monday through Friday.
• Palmer Township, Route 22 East inspection between Route 33 and South 25th Street, 9 a.m. to 3 p.m. on Monday.
• Palmer Township, Route 22 West inspection between South 25th Street and Route 33, 9 a.m. to 3 p.m. on Tuesday.
Monroe County
• Stroudsburg, I-80 surveying between Exit 306 (Dreher Avenue) and Exit 302 (Route 33 to Route 209), 8 p.m. to 6 a.m. Sunday through Friday.
• Stroud Township, I-80 pothole patching between Exit 304 (Route 209 to Route 33) and Exit 307 (Route 611 to Route 191), 9 a.m. to 3 p.m. Monday and Tuesday.
• Various townships: Route 33 South drainage between Saylorsburg and Route 512, 9 a.m. to 3 p.m. Wednesday and Thursday.
• Tunkhannock Township, I-80 East pothole patching between Exit 277 (Route 940 / TPK) and Exit 284 (Route 115), 9 a.m. to 3 p.m. Monday and Tuesday.
• Polk Township, Route 534 tree cutting/removal between US 209 and Carbon County, 9 a.m. to 3 p.m. Monday through Friday.
• Smithfield Township, US 209 lane restrictions between I-80 and Oak Grove Road, 9 a.m. to 3 p.m. Monday through Friday.
• Hamilton Township, Greenview Drive tree cutting/removal between US 209 and Hamilton East Road, 9 a.m. to 3 p.m. on Friday.
Schuylkill County
• West Penn Township, Route 309 drainage between Clamtown Road and East Penn Drive, 7 a.m. to 3 p.m. Monday through Friday.
• Ryan and Rush townships: Route 54 pothole patching between Morea Road and Tippets Road, 7 a.m. to 3 p.m. Monday through Friday.
• Ryan and Mahanoy townships: I-81 crack sealing between Exit 124 (Route 61) and Exit 131 (Route 54), 7 a.m. to 3 p.m. Monday through Thursday.
Comments